Systems, Services, & more...
- Normal Conducting Magnets Database
- TE-MSC-MNC
- PS ring magnets and their characteristics
- PS main magnets, the design report
Videos:
- complete_exchange_cycle_of_magnet_6_in_2003
- MU75exit20131030_151636
- MU75exit20131030_152050
- MU75exit20131030_152233
- MU75exit20131030_152538
- MU75exit20131030_152632
- MU75exit20131030_152708
- MU75exit20131030_150931
- MU75exit20131030_151422
- MU75exit20131030_152510
- MU75exit20131030_154645
- MU75exit20131030_154933
- MU34comesback20131216_160855
- MU340511203PB051412
- MU340511203PB051413
- MU340511203PB051414
- Around_PSring-TheTop
- 20131209_150549
- 20131209_144937
- 20131209_144650
- 20131209_144529
- 05-PS
- 00-INTRO_CCC
http://elogbook.cern.ch/eLogbook/event_viewer.jsp?eventId=1089442
Beam Vacuum Operation BVO / TE-VSC-IVM
Activities are summarized In this link: https://espace.cern.ch/VSC-BVO-injectors/actions/Lists/Tasks
Vacuum Sector | Sensible components | Bake out | Bake out equipment | Pumpdown before protons | Pumpdown before ions | Comments |
---|---|---|---|---|---|---|
PR10 | WCM03 after YETS | YES | WCM | At least 5 days (including in situ bake out) | 1 month | No venting at least 1 month before ion run. This values are estimations from lab measurements |
PR20 | SMH16 | YES | SMH16 | 1 week including baking SMH16 (24h if short venting, max. 2h) | 1 month | The need of baking depends on the length of the venting. Sector very radioactive. An extra pumping group has to be attached to SMH16 |
PR30 | SEH23, SMH26 | YES | SMH26 | 1 week including baking SMH26 (24h if short venting, max. 2h) | The need of baking depends on the length of the venting. | |
PR40 | SEH31 | NO | 24h | 2 weeks | ||
PR50 | SMH42, KFA45 | YES | SMH42 | 1 week including baking SMH42 (24h if short venting, max. 2h) | 1 month | The need of baking depends on the length of the venting. |
PR60 | SMH57 | YES | SMH57 | 1 week including baking SMH57 (24h if short venting, max. 2h) | 1 month | The need of baking depends on the length of the venting. |
PR70 | Window to East Hall | NO | 24h | 1-2 weeks | This sector must be vented carefully to avoid breaking the window to the East Hall | |
PR80 | KFA71, KFA79 | NO | 24h if short venting, max. 2h. 2-3 days if longer | 1 month | ||
PR90 | NO | 24h | 1-2 weeks | |||
PR100 | NO | 24h | 1-2 weeks | |||
TT2-LINE | ||||||
F16-10 | ||||||
F16-20-FTA | ||||||
F16-30-FTS+FTN |
Courtesy of Vacuum team (Jose Antonio Ferreira Somoza)
Technical board for PS and SPS beam diagnostics
Beam Instrumentation
beam loss monitor (BLM)
Injectors de-cabling Project
Anciennes cablotheques papier scannees CERN-0000094320 + EDMS 1219253
Cable identification campaign strategy EDMS 1154423/ 1149428 , Booster
CABLE Working Group indico 3014, 6591
Identification of Obsolete Cables in the PS 1360756,1360758, 1363398,1367909,
GesMar
DEC - Demande d'Enlevement de Cables - EDMS: 1314019
DIR - Demande d'Installation de Racks - EDMS: 1398443
DIC - Demande d'Installation de Cables - EDMS: 1210369
DIF - Demande d'Installation Fibre Optique - EDMS: 1153880
DFP - Demande de Fourniture de Patchcords - EDMS: 1300564
Accelerators and Storage Rings CERN-58-06-A http://cds.cern.ch/record/102348
Accelerators and Storage Rings CERN-59-26 http://cds.cern.ch/record/214348
Fifty years of the CERN Proton Synchrotron : Volume 1
Fifty years of the CERN Proton Synchrotron : Volume 2
Extensionion of the PS lifetime